The final plans have been submitted for approval. It’s estimated that this step can take 6 weeks. At the same time we have the fire approval, work with the building technicians (ventilation, heating, water, sewage, electricity, cabling (power, speakers, ethernet, KNX, DALI).
Next step is visiting Timm Fensterbau to think about windows, and the lichtband (length: 16,20m, width 1,65m).